  "assumptions": [
    "The final Part 53 framework exists, but facility elections and license-specific requirements are not assumed.",
    "Passive safety can reduce some consequences but does not eliminate sabotage, cyber, insider, supply-chain, or grid hazards.",
    "Digital design decisions can become licensing-basis evidence and must be controlled from concept through operation."
  ],
  "canonicalUrl": "https://xn--mwe.com/facility-patterns/part-53-advanced-reactor/",
  "classification": "NON-CERTIFYING REFERENCE PATTERN",
  "context": "A new advanced reactor under a Part 53 licensing path supplies a high-consequence compute campus.",
  "controlIds": [
    "GOV-01",
    "GOV-03",
    "ARC-01",
    "ARC-03",
    "ID-01",
    "SUP-01",
    "SUP-02",
    "OT-01",
    "AUT-01",
    "EVD-02"
  ],
  "directAnswer": "Use security-by-design, technology-inclusive licensing evidence, consequence analysis, and selected Part 73 pathways from the beginning; never infer election, applicability, or approval from the existence of the final rule.",
  "id": "FP-K06-002",
  "name": "Part 53 advanced-reactor campus",
  "nonClaims": [
    "Not a Part 53 application",
    "Not an NRC approval",
    "Not a conclusion that armed responders or other safeguards may be removed"
  ],
  "priorityHazards": [
    "security claims unsupported by design evidence",
    "digital I&C common-cause failure",
    "remote fleet-management compromise",
    "supply-chain and firmware substitution",
    "authority drift between applicant, licensee, vendor, and datacenter operator"
  ],
  "releaseId": "K12-2026-08-16",
  "requiredEvidence": [
    "licensing-path and election record",
    "security-by-design traceability",
    "high-consequence event analysis",
    "digital asset and support-system inventory",
    "independent verification plan and change control"
  ],
  "slug": "part-53-advanced-reactor",
  "tailoringQuestions": [
    "Which Part 73 provisions are elected or imposed?",
    "Which claims depend on passive safety and what defeats them?",
    "How are vendor, fleet, and remote-service privileges bounded?",
    "What evidence is required at each licensing and deployment milestone?"
  ],
  "workPackageIds": [
    "WP-K06-01",
    "WP-K06-02",
    "WP-K06-03",
    "WP-K06-04",
    "WP-K06-06",
    "WP-K06-08",
    "WP-K06-09"
  ]
}