Discovery and inventory
Direct answer
Phase 1, Discovery and inventory, is IN_PROGRESS in the static reference plan.
Authority, operation, and disclosure boundary. K10 publishes static tools, deterministic synthetic fixtures, review queues, offline observation records, migration and merge reports, abstract dependency analysis, reference transition plans, audit trails, signed offline receipts, redaction records, and a release-time dashboard. It does not perform live monitoring, deployment, procurement award, facility certification, network reconnaissance, protected-system operation, legal authorization, or factual adjudication.
Phase contract
| Property | Value |
|---|---|
| Phase ID | CTP-K10-001 |
| Sequence | 1 |
| State | IN_PROGRESS |
Entry criteria
- Named accountable owner
- Affected assets identified
- Required evidence and stop conditions declared
Required evidence
- Versioned inventory
- Interoperability test result
- Rollback or continuity evidence
- Supplier-status record
Exit criteria
- Mandatory evidence current
- Blocking defects resolved or accepted by authority
- Successor and rollback states recorded
Rollback conditions
- Verification failure
- Interoperability regression
- Unresolved supplier dependency
- Evidence-chain break
Non-claim
Reference phase plan only; it does not establish deployment, quantum resistance, certification, or production readiness.