K10 · bounded transition and assurance evidence

Bounded pilot

Direct answer

Phase 2, Bounded pilot, is PLANNED in the static reference plan.

Authority, operation, and disclosure boundary. K10 publishes static tools, deterministic synthetic fixtures, review queues, offline observation records, migration and merge reports, abstract dependency analysis, reference transition plans, audit trails, signed offline receipts, redaction records, and a release-time dashboard. It does not perform live monitoring, deployment, procurement award, facility certification, network reconnaissance, protected-system operation, legal authorization, or factual adjudication.

Phase contract

Transition phase
PropertyValue
Phase IDCTP-K10-002
Sequence2
StatePLANNED

Entry criteria

  • Named accountable owner
  • Affected assets identified
  • Required evidence and stop conditions declared

Required evidence

  • Versioned inventory
  • Interoperability test result
  • Rollback or continuity evidence
  • Supplier-status record

Exit criteria

  • Mandatory evidence current
  • Blocking defects resolved or accepted by authority
  • Successor and rollback states recorded

Rollback conditions

  • Verification failure
  • Interoperability regression
  • Unresolved supplier dependency
  • Evidence-chain break

Non-claim

Reference phase plan only; it does not establish deployment, quantum resistance, certification, or production readiness.