K05 assurance architecture

United States — NRC Part 53 and Part 73 Subpart J path

Direct answer

OPTIONAL FRAMEWORK; LICENSEE ELECTION AND NRC APPROVAL REQUIRED

Evidence boundary. These records describe architecture, control relationships, test requirements, and legal-source status. They do not certify a facility, authorize a mission, prove deployment, or replace current facility-specific engineering and legal review.

Authority state

OPTIONAL FRAMEWORK; LICENSEE ELECTION AND NRC APPROVAL REQUIRED

Issue matrix

United States — NRC Part 53 and Part 73 Subpart J path authority boundaries
IssueStatusBoundary
Physical protection73.100 AVAILABLE TO QUALIFYING PART 53 LICENSEES THAT ELECT ITPerformance-based does not mean unregulated or automatically staff-free.
Digital systems and networks73.110 AVAILABLE WITH THE ELECTED FRAMEWORKExact protected systems and controls remain facility-specific.
Access authorization73.120Program design remains subject to the rule, guidance, license and NRC oversight.
Security staffing alternativesFACILITY SHOWING REQUIREDK05 rejects a universal zero-armed-responder claim.

Qualification

Not legal advice; Final-rule status is verified; application to a named reactor requires licensing analysis.

Sources: Risk-Informed, Technology-Inclusive Regulatory Framework for Advanced Reactors — Final Rule · 10 CFR Part 73 Subpart J — Security Requirements at Commercial Nuclear Plants

Machine-readable matrix